kcalvi1
-
Posts
6 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Gallery
Downloads
Posts posted by kcalvi1
-
-
Hello,
I have created a sub-model with two servers connected by a path that will process n types of entities (i.e. different products that share a work station). In the main model these entities have a table reference assignment (specified at the source) that allows different processing times in each server in the model. If these entities enter the sub-model how can I allow for different processing times? Since there is no source in the sub-model I do not see a way to assign the a reference table (normally done in the source).
Thank you for any ideas!

Several shifts in a system
in SI General Discussions
Posted
Hello all,
How can I make several stations seize the resource which is currently on shift. Let's say server one needs a resource to process a unit (not for the whole processing time but a fraction of it), to model this process I use the seize, delay and release steps in the process window. If I have 3 shifts of operators how can I make my server seize the one on shift. Given that they have breaks, How can this behavior be incorporated. I tried using the decide step, using the resource state and the capacity allocated, but it did not work.
Thank you for your suggestions.