Jump to content

gilari9363

Members
  • Posts

    1
  • Joined

  • Last visited

Everything posted by gilari9363

  1. I have a model where there are 4 servers with Processing Count Based failures. So every 5 cycles, the specific machine has a lockout and needs to be serviced by a worker. I am trying to have status label that shows how many cycles are left before the machine goes into lockout. I am having trouble figuring out the logic for it.
×
×
  • Create New...