Thank you Dave. To answer your question. No, I don't need 5000 entity instances for this setup to get OR utilization. If I were to add the specific Surgical Procedure Type then the sampling will give me specifics. I can just replace the column. But this was an easy way for me that I knew to get the model working right with the sequence table. I'll go back to see about using one and calling it "Patient".
I have a question though about scheduling.
My time dates are only looking at surgical cases Monday through Thursday. The important factor is that the utilization should only measure between 730AM to 730PM. The work days is where I am getting different Utilization values depending on what I input. How am I to look at this properly. Is it that each day should follow this setup.
or am I doing this setup, which does seem right to me yet the values are more logical.
The utilization are drastically different.