Jump to content

Recommended Posts

Posted

I am building an inland waterway simulation model. The terminal has two cranes. Barge 1 arrives and both cranes handle containers from barge 1. If barge 2 arrives (e.g. after 2 hours), 1 crane stops handling barge 1 and goes to barge 2 to handle this barge. Any tips on how to model this?

×
×
  • Create New...