ZanStern Posted September 30, 2022 Share Posted September 30, 2022 I have a problem with producing/consuming within my TaskSequence. I need multiple task operation (prepare -> work -> clean -> produce), where I'm also consuming/producing material defined inside my BOM table. When I'm trying to reference material requirements on the BOM table I get an error: "Could not determine the row to use in the referenced table or repeat group ...", references to the processing time and other parameters are working fine. If I set the task sequence reference to the BOM table, then material requirements works OK, but I could not add more than 1 task. I'm using version 15.241.27814 . Best regards, Žan Link to comment Share on other sites More sharing options...
ttarkan Posted October 13, 2022 Share Posted October 13, 2022 Zan, I think we were facing the same problem. I found the solution. You can check here. Hope it helps. Link to comment Share on other sites More sharing options...
Recommended Posts