Jump to content

Task Sequence - Material Requirements


ZanStern

Recommended Posts

I have a problem with producing/consuming within my TaskSequence. I need multiple task operation (prepare -> work -> clean -> produce), where I'm also consuming/producing material defined inside my BOM table. When I'm trying to reference material requirements on the BOM table I get an error: "Could not determine the row to use in the referenced table or repeat group ...", references to the processing time and other parameters are working fine. If I set the task sequence reference to the BOM table, then material requirements works OK, but I could not add more than 1 task. I'm using version 15.241.27814 . 

Best regards, Žan 

 

Link to comment
Share on other sites

  • 2 weeks later...
×
×
  • Create New...